OSD’s Role
- Engineering
- Procurement
- Technical Site Support
- Commissioning
Summary
OSD delivered the EPC of the 1.9km 10″ pipeline and delivery station at Cape Lambert, in JV with Monadelphous and KT-Pipelines. The pipeline connected to the existing purged, cut and capped Rio Pipeline (PL8). Mono’s-KT pipelines were responsible for the stations construction for this project.
OSD was responsible for engineering, procurement, regulatory, technical site support/inspection for the station and commissioning. OSD was also appointed operator for PL8 (and the new pipeline) during the commissioning of the interconnected pipeline system.