Client: Arrow Energy
Location: Surat Basin, QLD
Scope: Brownfield Construction
Date:
Project Length: 12 months
Value:

Industry

Oil & Gas

Scope

Supplementary Engineering and Design, Procurement, Construction and Commissioning of an 80TJ/day bi-directional flow metering station and interconnecting pipeline to connect the Braemar 2 Gas Pipeline and the Daandine Export Gas Pipeline to the Roma Brisbane Pipeline.

Key Achievements

  • Delivered integrated multi-discipline supplementary detailed design of the metering station and interconnecting pipeline on time & on budget.
  • Design and modification of the new and existing station control systems to facilitate new bi-directional flow cases.
  • Procurement, fabrication, transport, and logistics management of long lead pre-fabricated modules (skids) under pre-commitment.
  • Fabrication and construction of civil, structural, mechanical, piping, electrical, instrumentation, and control systems facilities.
  • 12,000 construction man-hours with zero HSE incidents.
  • Testing, pre-commissioning, commissioning, and handover to operations